Kyiv, Ukraine 🇺🇦
Implementation date October 2021
About the project:

Implementation cost EUR 8 290
S – 13 m sq

Design project for two boys.

The play area, above the sleeping places, turned out to be quite spacious, a wardrobe, a rack for toys and a moving table – everything that the guys who are still far from school need!

I want the same one